#access roads
Read all articles about #access roads
- 728 camera online
- 0 camera offline
-
- 15.12.2021.
- 1 camera(s)
Peljesac bridge in trouble
-
- 31.10.2021.
- 1 camera(s)
Resistance of the Peljesac Bridge
The Pelješac Bridge with its 2404 meters encircled the Mali Ston Bay and connected Croatia and its construction is nearing completion. The commissioning depends on the dynamics of the construction of access roads, most of which will be completed according…
-
- 29.05.2021.
- 1 camera(s)
Connecting Croatia - Peljesac Bridge final segments soon to be constructed
-
- 15.02.2021.
- 1 camera(s)
The Pelješac bridge connects with the mainland
The Pelješac Bridge, the most important infrastructure project in Croatia, has entered its final year of construction this year. The pillars above the sea surface outline the route of the future road, which could be completed by the end of 2021, and…
-
- 22.10.2020.
- 1 camera(s)
The Pelješac bridge takes its shape
There are nine months left until the deadline for the construction of the Pelješac bridge near Neum, which will connect Dubrovnik region with the rest of Croatia. The Pelješac bridge is slowly taking it’s shape, and it has certainly changed the view…
-
- 24.07.2020.
- 1 camera(s)
The construction of the Pelješac bridge does not stop
Although the corona pandemic still has an impact on the construction of the Pelješac bridge, the deadlines could be broken for the same reason, ie the entire project could be extended for several months, so the final opening of the bridge could be in…