#Connecting Croatia Read all articles about #Connecting Croatia 719 camera online 0 camera offline 09.06.2021. 1 camera(s) news The last phase of the construction of the Pelješac Bridge The last ship from China with 320 meters (24 pieces) of steel spans for the Pelješac Bridge arrived in Croatia. 29.05.2021. 1 camera(s) news Connecting Croatia - Peljesac Bridge final segments soon to be constructed