#road connection project Read all articles about #road connection project 716 camera online 0 camera offline 24.07.2020. 1 camera(s) news The construction of the Pelješac bridge does not stop Although the corona pandemic still has an impact on the construction of the Pelješac bridge, the deadlines could be broken for the same reason, ie the entire project could be extended for several months, so the final opening of the bridge could be in…